FINAL ASSIGNMENT DOMUM 50%
(20% GROUPWORK+30% INDIVIDUAL)
TASK
This assignment has two part which is part A and Part B.
In part A, it is 20% group work. We decide on a group by ourselves according to the class's section. In this group work, we need to choose a site which can be located in our country or oversea. We need to discuss what scale we use in the site plan. And also we need to decide on a company name, the company address, and the name of the architect. The title block that we created should be drawn on the same scale in each of our drawings.
We need to discuss the furniture and materials that we will use in this house such as the wall, floor, window, and roof.
In part B, it is 30% of individual work. We are required to draw one site plan, 1-floor plan, 2 elevations, and 1 section where the furniture and materials which is followed by the group discussions.
OUR CHOOSEN
SITE CONDITION: RIVERSIDE
LAYOUT: OPTION C
PROGRESS
WEEK 10 20-24 JUNE 2022
FINALIZE GROUP, GROUP MEETING, DECIDE GROUP LEADER, TITLE BLOCK
This week we had to decide on a group by ourselves. My group member is Chong Eve, Jancis Chong, Ooi Ee Ching, Cheah Jing Xuan, and Yap Yong Liang.
We had a group meeting this week. During the group meeting, we decided to choose Jancis to be our group leader. Not only that, we discussed the proposed site and choose the layout together. We also decide the name and address of our company. We choose IKEA furniture and we created a CANVA for everyone to put the furniture and materials.
WEEK 11 27-1 JULY 2022
FINALIZE SITE PLAN, DRAFT FLOOR PLAN, FINALIZE FLOOR PLAN
This week, I had to finalize my site plan and our group finalize the title block. Besides, I had drawn my floor plan. During tutorial class, I show my progress to Mr.Akmal but I need to redo the floor plan after receiving his feedback. My initial floor plan is not workable and not suitable. I had redo and finalize my floor plan.
WEEK 12 4-8 JULY 2022
ELEVATION DRAWING
This week I started to draft and sketch my elevation drawing. After I received feedback from Mr.Akmal during the tutorial class, I started drawing my two actual elevation drawing.
WEEK 13 11-15 JULY 2022
FINALIZE SECTIONAL DRAWING
This week, I finalize my sectional drawing.
WEEK 14 18-22 JULY 2022
INK, FINALIZE THE WHOLE ASSIGNMENT, SUBMISSION
This week I finalized and double-checked all the drawings. I confirmed with Mr.Akmal about my drawing after I start inking it. I started to ink my drawings by using a 0.4 Artline pen.
ADDICTIONAL PROGRESS PHOTOS
FINAL OUTCOME
CONCLUSION
I learned how to communicate and work with my group members effectively. This assignment helps me to improve more on my drawing techniques and skills.
REFLECTION
In this assignment, I learned that communication skills are really important. This is because the Part A of this assignment is group work. We need to decide all the tasks with our group members. During the discussion, we should advise others' opinions in a gentle tone and not argue. In a group assignment, we had to share and participate in the work. Not only that, but I also learned about the importance of teamwork. I'm very happy that we make a good decision on choosing Jancis as our group leader because a leader will make the move on the whole group. I was also really happy that every member had put 100% effort into this assignment, no matter it in group part or individual part.
Besides that, I had more understanding of the symbol of the material, and furniture. By this assignment, I had improved my drawing techniques and skills compared to the last assignment.
TGC
COMMUNICATION SKILLS
COMMUNICATE APPROPRIATELY IN VARIOUS SETTINGS AND MODELS.
SPECIFIC DISCIPLINE KNOWLEDGE
UNDERSTAND ETHICAL ISSUES IN THE CONTEXT OF THE FIELD OF STUDY.
INTRAPERSONAL SKILLS
UNDERSTAND AND ASSUME LEADERSHIP.